About
NEWS
Design
Carrollton GreenBelt
Commerce Drive Cycle Track
East Decatur Greenway
Emory PATH
Freedom Park Trail
Ivan Allen PATH
Newnan LINC Model Project
Northwest BeltLine Connector
PATH Parkway
Panola Mountain State Park Greenway
Peachtree Creek Greenway
Proctor Creek Greenway Model Project
South Peachtree Creek Greenway
Spanish Moss Trail
Westside BeltLine Connector
West End Beltline
Planning
Atlanta BeltLine Northwest Trail Study
Clayton Connects
Columbus Dragonfly Trails
Decatur PATH
East Point PATH
Emerald Trail
Flint River Trails
Gordon County Trail System
Newnan LINC
Proctor Creek Greenway
Sandy Springs Trail
The Thread
Tucker PATH
Branding
Rome EcoGreenway Branding
Branding of the PCG
Carrollton GreenBelt
Columbus Dragonfly Trails
East Point PATH
HiwasseeRiver Blueway
PATH 400 TRAIL
South Chickamauga Creek
Rocky Face Ridge Park Signs
Civil Engineering
Enclave at Druid Hills
Manchester Phase 1-3
Voysey at Alpharetta Downtown
The Heights at Ashford Park
Contact

KAIZEN Collaborative

About
NEWS
Design
Carrollton GreenBelt
Commerce Drive Cycle Track
East Decatur Greenway
Emory PATH
Freedom Park Trail
Ivan Allen PATH
Newnan LINC Model Project
Northwest BeltLine Connector
PATH Parkway
Panola Mountain State Park Greenway
Peachtree Creek Greenway
Proctor Creek Greenway Model Project
South Peachtree Creek Greenway
Spanish Moss Trail
Westside BeltLine Connector
West End Beltline
Planning
Atlanta BeltLine Northwest Trail Study
Clayton Connects
Columbus Dragonfly Trails
Decatur PATH
East Point PATH
Emerald Trail
Flint River Trails
Gordon County Trail System
Newnan LINC
Proctor Creek Greenway
Sandy Springs Trail
The Thread
Tucker PATH
Branding
Rome EcoGreenway Branding
Branding of the PCG
Carrollton GreenBelt
Columbus Dragonfly Trails
East Point PATH
HiwasseeRiver Blueway
PATH 400 TRAIL
South Chickamauga Creek
Rocky Face Ridge Park Signs
Civil Engineering
Enclave at Druid Hills
Manchester Phase 1-3
Voysey at Alpharetta Downtown
The Heights at Ashford Park
Contact
Greta deMayo
December 4, 2019

Grand Opening for Peachtree Creek Greenway Phase1 - Dec. 12

Greta deMayo
December 4, 2019

The ribbon cutting ceremony of the Peachtree Creek Greenway model project is scheduled on Thursday, Dec. 12, at 11:00 a.m. We are honored to be a part of the design team for such a great project!

Peachtree-Creek-Greenway-Grand-Opening.jpg
Trail lighting was complete and powered

Trail lighting was complete and powered

A night shot looking at the signature bridge of the PCG

A night shot looking at the signature bridge of the PCG

Newer PostEmory PATH
Older PostField Walk-Peachtree Creek Greenway
Back to Top
KAIZEN Collaborative, 5256 Peachtree Road, Ste 130, Chamblee, GA, 30341, United States