About
NEWS
Design
Carrollton GreenBelt
Commerce Drive Cycle Track
East Decatur Greenway
Emory PATH
Freedom Park Trail
Ivan Allen PATH
Newnan LINC Model Project
Northwest BeltLine Connector
PATH Parkway
Panola Mountain State Park Greenway
Peachtree Creek Greenway
Proctor Creek Greenway Model Project
South Peachtree Creek Greenway
Spanish Moss Trail
Westside BeltLine Connector
West End Beltline
Planning
Atlanta BeltLine Northwest Trail Study
Clayton Connects
Columbus Dragonfly Trails
Decatur PATH
East Point PATH
Emerald Trail
Flint River Trails
Gordon County Trail System
Newnan LINC
Proctor Creek Greenway
Sandy Springs Trail
The Thread
Tucker PATH
Branding
Rome EcoGreenway Branding
Branding of the PCG
Carrollton GreenBelt
Columbus Dragonfly Trails
East Point PATH
HiwasseeRiver Blueway
PATH 400 TRAIL
South Chickamauga Creek
Rocky Face Ridge Park Signs
Civil Engineering
Enclave at Druid Hills
Manchester Phase 1-3
Voysey at Alpharetta Downtown
The Heights at Ashford Park
Contact

KAIZEN Collaborative

About
NEWS
Design
Carrollton GreenBelt
Commerce Drive Cycle Track
East Decatur Greenway
Emory PATH
Freedom Park Trail
Ivan Allen PATH
Newnan LINC Model Project
Northwest BeltLine Connector
PATH Parkway
Panola Mountain State Park Greenway
Peachtree Creek Greenway
Proctor Creek Greenway Model Project
South Peachtree Creek Greenway
Spanish Moss Trail
Westside BeltLine Connector
West End Beltline
Planning
Atlanta BeltLine Northwest Trail Study
Clayton Connects
Columbus Dragonfly Trails
Decatur PATH
East Point PATH
Emerald Trail
Flint River Trails
Gordon County Trail System
Newnan LINC
Proctor Creek Greenway
Sandy Springs Trail
The Thread
Tucker PATH
Branding
Rome EcoGreenway Branding
Branding of the PCG
Carrollton GreenBelt
Columbus Dragonfly Trails
East Point PATH
HiwasseeRiver Blueway
PATH 400 TRAIL
South Chickamauga Creek
Rocky Face Ridge Park Signs
Civil Engineering
Enclave at Druid Hills
Manchester Phase 1-3
Voysey at Alpharetta Downtown
The Heights at Ashford Park
Contact
Greta deMayo
November 19, 2020

Newnan LINC Construction Update - the installation of Trail Bridge over I-85

Greta deMayo
November 19, 2020

The iconic LINC bridge has been installed in October! This is an exciting moment to have it as a connection between both sides of I-85.

The rest of the trail is expected to be finished by the end of this year. Stay turned for the ribbon cutting ceremony.

NewnanLINC-BridgeInstallation1.jpg
NewnanLINC-BridgeInstallation3.JPG
NewnanLINC-BridgeInstallation4.jpg
NewnanLINC-BridgeInstallation5.JPG

Tagged: NewnanLINC, PATH Foundation

Newer PostWestside BeltLine Connector - the 300th Mile of PATH Trails
Older PostNewnan LINC Construction Update - Trail Bridge over I-85 Up-coming!
Back to Top
KAIZEN Collaborative, 5256 Peachtree Road, Ste 130, Chamblee, GA, 30341, United States